Description
A hotel room in Mega Mall, the first hotel with two swimming pools, first row, on the western axis in front of the banking area and Al Masa Hotel.
First, we will talk about the area of the two projects in full, in order to link the external area of the projects to being a private area in Golden Town.
_ The entire facade of the projects on the main axis is 246 metres
78 meters deep
________
Engineering consultants
Art Line: Design and implementation consultant
IEC Company: Consultant for soil, support works and ground sensors
Arkan Company: Consultant for developing all projects in general
________
_ The total area of ouro is 9,000 square metres
_ The sales area is about 6,000 square metres
_The project’s facade on the axis is 103 meters with a depth of 59 metres
_ The construction percentage of the commercial part is 45% of the land area
_ Ground floor area 2,690 meters
_ The area of the third and fourth floors is 2,190 meters
_ The area of the sixth floor is 1,934 square metres
_______
The building is divided into: Building 1 & 2 & 3
Ground floor, shops and cafes
First retail floor
Second floor, Foodcourt
Third floor retail
Fourth floor, Fodercourt
_ Administrative offices from the 5th floor to the 11th floor
_ From the 12th floor to the 14th floor, hotel rooms
________
We will start housing in some stores on the ground floor, and there are 75 stores on the floor
The third floor is a retail store with 37 stores on the floor
And the fourth floor is Foodcourt, with 33 restaurants on the floor
And the sixth floor (administrative offices), with 45 offices on the floor
_ 14th floor (hotel rooms), with 39 rooms per floor
______
There are 2 pharmacies
_______
_ Building 1 has a back gate
It has 2 elevators and 1 service elevator
_ Building 2 has a back gate
(Especially for hotels)
It has 2 elevators and 1 service elevator
_ Building 3 has a back gate, 2 elevators, and 1 service elevator
________
_ 2 panoramic elevators for commercial areas
_ Electrical stairs, 2 to the right of the entrance and 2 to the north of the commercial entrance, from the facade of the building
________
It has 2 sky pool
The area of each one is 52 square metres
_________
The download rate is 35% commercial
33 to 34% are administrative
________
_ Commercial delivery without finishing
_ The administrative unit is finished, with only the adjustment connections connected
_ The hotel is finished with furniture and air conditioners
________
The contract delivery date is 6/30/2028
-------------------------------------------------- --------
- For inquiries and details: 01029986072
-------------------------------------------------- -------