Description
lake house project
Location:-
• Between the June 30 axis and the 70th Street axis - extension of the Ashra line
• New Obour City Authority - Carrefour Building 3 - Ammar Bin Yasser School.
The building is located on an area of 40 thousand square meters
• It consists of 6 floors (ground and five floors)
• It consists of 19 buildings - 19 elevators.
• 2 swimming pools, including a large children’s pool.
• Artificial lake – children’s play area.
• An indoor walkway for sports, walking and cycling.
• A commercial mall on the front of the project.
• A huge central park (rest areas and bar tours).
Very close to the Middle Ring Road - 25 minutes to the Administrative Capital - 20 minutes to the Settlement, Badr and Shorouk.
The project is on line 10, Cairo-Ismailia Desert Road (Nasr City - Heliopolis)
It is close to the cities of the Delta region (Al-Sharqiya - Qalyubia - Menoufia), only 45 minutes away.
Distinctive hotel services and family spaces - security and surveillance cameras - super luxurious finishing - brands with international management specializing in the management of commercial malls