Description
Shifa Capital Hospital
Location
In the Medical City, first row on a central axis parallel to the southern Zayed Road, direct view of the Media Production City and the iconic tower next to R6 and next to the Regional Ring Road and EXPO CITY
Hospital Details
Land Area: 13000
Construction Ratio: 40% Service
Two basement floors are allocated on the entire land area
Number of floors G+5
From the first to the fifth medical clinics
A building dedicated to the hospital only
Building B1 is dedicated to outpatient clinics
Building B2 is dedicated to outpatient clinics
Hospital Services
A private entrance to the hospital
A private entrance for emergencies
A private entrance for each of the outpatient clinic buildings
A reception for each building
Information Lobby for each floor
4 elevators for each of (patients, doctors, Visitors)
An elevator dedicated to furniture for clinic equipment for doctors
An elevator dedicated to Turley to transport patients in the hospital
5 emergency stairs for each floor
Toilets for men and women
Toilets for people with special needs
Waiting areas for patients on each floor
A duct dedicated to medical waste
The clinics are delivered to doctors fully finished
Antibacterial paints
All clinics have ACC
All clinics are divided from the inside ready for operation
Payment systems
10% down payment over 5 years
20% down payment over 6 years
Maintenance deposit
10% of the total is divided into two installments
*5% on 1/1/2025
*5% on 1/6/2025
Price Meter starts from 92,500k to 99,000k
Clinic 43m
(3,977,500k)
With a very special payment system
10% down payment over 5 years
20% down payment over 6 years
Hospital delivery date 2026